Job Description The Service holder will be responsible to control that the work performed by CTR and sub-CTR is in line with CPY and Project Specifications for Production Manifolds and Foundations in terms of Quality. For all these tasks, the incumbent will be requested: • To conduct thorough inspections of welds and welding processes to ensure compliance with applicable WPS/PQR, codes, standards, and specifications, have ability to conduct welding inspection before, during and after as per ISO 3834-2 requirements • To have ability to conduct welding inspection before, during and after as per ISO 3834-2 requirements • To have extensive inspection knowledge and experience (min 10 years) in CRA materials such as Super duplex (Pipe/Forging and HIPPED), Inconel 625 and LAS (F22) and • To have excellent inspection experience in buttering, overlay and girth welding of Inconel 625 and Alloy 59 consumables • To utilize advanced inspection techniques including visual, ultrasonic, Phase Array Ultrasonic Testing (PAUT), magnetic particle, Liquid penetrant Inspection and radiographic testing to assess weld quality as per ASME/DNV code requirements • To have ability to interpret welding procedure specifications (WPS) and procedure qualification records (PQR) to validate conformance at site during production • To have the ability to perform inspection on incoming production materials against requirements and mill certificates • To participate in root cause analysis for welding defects and development of corrective action plans in collaboration with project welding engineer and site production teams • To identify and raise subsequent comments highlight deviations, unacceptable or unjustified quality issues related but not limited to Welding that could affect SPS equipment during fabrication, installation, and production at site • To prepare detailed inspection reports and documentation for compliance on weekly basis • To collaborate with Company Site Rep and CPY material engineer on any welding/NDT/material issues at site • To stop the work in case of non-conformity and re-assess the situation before resuming To discuss with contractor/sub-contractors in case of issues/unconformity during the control program, to look for acceptable solutions in order not to penalize the delivery schedule but still fulfilling the quality standards set by the contract • To ensure that unconformities are driven towards closure in a timely manner (i.e. without impacting the delivery schedule) • To follow up site welding activities and provide feedback to project team • To participate to COMPANY and contractor audits and follow up closure of identified issues