Social network you want to login/join with:
Project Manager Repairs Manufacturing Engineering, Getafe
Client:
Airbus
Location:
Getafe, Spain
Job Category:
Other
EU work permit required:
Yes
Job Reference:
748788896358413107232460
Job Views:
2
Posted:
23.07.2025
Expiry Date:
06.09.2025
Job Description:
The activities to be performed and management include, among others:
* Collect inputs from shopfloor to define Out Standing Work (OSW) in Quality Gates, including standard time value, Ticon, parachevement, creating and transferring work orders from/to internal customers Illescas/Hamburg.
* Support management of Non Conformities: creation, management, S03 orders, standard time value definition.
* Create & update ME specific documentation, such as SOI, NSI, Routings, MTM validations, drawings.
* Create WO for OSW & manage Conf. Mgmt Gaps related to OSW activity.
Perimeter of activities: OutStanding Work may relate to late modifications, shop-floor issues, rework due to NC or Concession, installation, or removal.
The Service Provider shall : provide OutStanding Work management, including specific work order creation for conflict management. If OutStanding Work occurs, create a Retrofit Routing or Parachevement to ensure a Constituent Assembly (CA) conforms to the definition and resolve Delta 2 gaps.
* Check, assess, track, and respond to NCs, send or close requests to appropriate actors.
* During definition, work preparation, manufacture, assembly, or test, any issues on the design data set shall be raised with engineering.
* Provide NC and DQN creation and management.
* Calculate time at routing operation level, including standard time value (STV) using MTM, with feedback from shopfloor routines.
Inputs include described process by the SOI, master calculation for similar operations, production planning, and documentation provided during kick-off.
Deliverables include routing operations with time calculations in SAP, validation macro results, potential optimization list, and a Pareto analysis of gaps versus previous routing times with root cause grouping and initial action plans.
Complexity Matrix:
* LOW: Routing operations below 1 hour with 1 manpower allocated.
* MEDIUM: Routing operations between 1 and 2 hours with 1 manpower.
#J-18808-Ljbffr